An on-premises Pega system runs on servers and a database that your own organisation owns and operates, as opposed to Pega Cloud where Pega runs it for you. Upgrading such a system is a project, not a button. This article gives you the outline that most on-premises upgrades follow, and the questions to answer before you start.
Phase 1: Plan
- Read the target version's release notes and the platform support matrix. Confirm that your database, Java version and application server are supported.
- Decide between an in-place or out-of-place upgrade.
- List every application, ruleset and integration that will be affected, and agree the downtime window.
- Take a full backup of the database and the current installation, and confirm you can restore it.
Phase 2: Prepare a non-production copy
- Restore a copy of production into a test environment.
- Run the upgrade there first, using the same scripts and settings you plan to use in production.
- Time each step. The timings tell you whether the production window is long enough.
Phase 3: Upgrade
- Stop the application servers.
- Run the database upgrade scripts or the installer's upgrade option, as the guide for your version describes.
- Deploy the new Pega software to the application servers and update the configuration files, such as the data source settings.
- Start the servers and let the system rebuild its caches.
Phase 4: Post-upgrade
- Run the upgrade utilities and revalidate your rules. See our walkthrough of the post-upgrade fixing process.
- Clear out deprecated rules and warnings.
- Regression test the main flows and integrations, and run a performance test.
- Monitor the logs closely for the first days.
A worked example
A bank running Pega on its own servers plans a Saturday night upgrade. In the two weeks before, the team upgrades a copy of production twice, finds that one custom Java library fails, and fixes it. On the night they stop the servers at 22:00, finish the database upgrade by 01:30, start the new servers at 02:00, and pass the smoke tests by 04:00. Because the timings from the rehearsal were recorded, the window was long enough with room to spare.
Risks to manage
- Custom code, such as Java or JavaScript, may not work on the new version.
- Third-party libraries and JDBC drivers may need updating.
- Integrations may need retesting if the partner's API or your connector settings changed.
Interview tip
Talk through plan, rehearse, upgrade, verify, and mention that you always take a backup you have proven you can restore. Read more in the Upgrade label.